Streatham & Clapham
High School

Client

Girls Day School Trust

Value

£13,700,000

Sectors

Education

An award-winning project, with two distinct phases of work.

The first added a new floor to accommodate a sixth form centre providing social and teaching areas at roof level with access being provided by extending two existing stair towers.

The second phase introduced an extension at ground level to house a new dining room, kitchen and to form a new entrance and reception area.

The method of construction utilises a cross laminated timber (CLT) frame to keep structural loading on the existing building to a minimum. Although to accommodate the additional load, localised foundation strengthening was also necessary and accomplished by installing mini-piles.

The facades are formed of a ceramic cladding system utilising both baguettes and tiles.

Internally, Cotterell Vermulen Architecture specified that the timber frame should be left exposed to stunning effect. The finishes are to a high quality with bespoke built in furniture storage solutions.

The works were completed whilst the school remained in occupation, with the necessary temporary works installed to allow business as usual.

Woodley Coles provided full pre and post contract quantity surveying services from early feasibility to the agreement of the final account.

  • Architect

    Cotterell Vermulen Architecture

  • Contractor

    Rooff

  • Project Manager

    Tuffin Terraby Taylor

  • Structural Engineer

    engineers HRW

  • Services Engineer

    OR Consulting

Ready to talk
about your next
project with us?

Woodley Coles logo graphicContact us today